Before shot of the area, still need to do some plantings but a great little make over in regards to the structural set up of the area. So what i did was get rid of the old organic risers and any organic matter, treated all the old pavers with liquid chlorine and then high pressure hosed to area off. Then let it all dry off so when i concreted the new travertine over the top it amde sure of the perfect bond.

After shot